Shale Shake is the first stage of solids control equipment in drilling purification system. It can remove cuttings above 75um brought from the drilling well an d the liquid with smaller particles will flow into tanks, then the fluids will flow into next grade solids control equipment to be treated.


京公网安备 11010802043282号